  • 实验室装修净化注意哪些问题?
    来源:最新澳门网址大全 浏览: 发布日期:2017-07-05
    实验室装修中净化区是很重要的一部分,净化区处理得好,其实装修也就不成问题了,那么实验室装修该注意哪些问题呢?
    Laboratory decoration in the purification area is an important part of the purification zone handled well, in fact, decoration will not be a problem, then the laboratory renovation should pay attention to what problems?
    一、实验室装修之净化区域必须要考虑节能
    First, the laboratory decoration of the purification area, we must consider energy-saving

    在实验室装修中,体系及区域的区分,送风量计算,温度与相对温度的判定,净化级别与换气次数的确立,新风比,风管保温,风管制作中的借口方法对漏风率的影响,干管支管联接点对气流阻力的影响,法兰衔接是否漏风等以及空调箱、风机、冷水机组等设备挑选等都与能耗紧密关,所以,这些细节必需求思考到。空调机房宜在洁净室旁边面,这不但能够节能,也有利于风道的布置,并使气流组织愈加合理,同时能够节约工程费用。
    In the laboratory the decoration, and the regional distinction system, air volume calculation, to determine the temperature and relative temperature, establish, purification level and ventilation times of fresh air ratio, air duct insulation, wind pipe production method in excuse effect on the leakage rate, dry pipe branch pipe of air flow resistance, flange connection whether the air leakage and air conditioning box, fan, chillers and other equipment selection and energy consumption are closely shut, so these details will need to consider. The air conditioner room should be on the side of the clean room, which can not only save energy, but also benefit the arrangement of the air duct, make the air distribution more reasonable and save the cost of the project.
    二、实验室自控设备要能全程调解
    Two 、 laboratory automatic control equipment can be fully mediated
    实验室装修由于操控风量和风压的调理阀均存在技能隔层,并且吊顶也都是彩钢板的软吊顶,基本上都是在设备调试时调好,而后就不再调整,为保证洁净厂房的正常运转,应设置一套较完整的自控设备,应包含以下几个方面:洁净室空气洁净度、温湿度、压差监控、风阀调理;高纯气体、纯水和循环冷却水的温度、压力、流量的检测;气体纯度、纯水水质的监测等。这些监控设备可规划成单个体系操控体系,也可规划成集散式计算机操控和办理体系。
    Laboratory renovation due to conditioning valve control air volume and pressure are skills and are also the interlayer, ceiling ceiling soft color steel plate, are basically in the equipment debugging is adjusted well, then no adjustment, in order to ensure the normal operation of clean plant, should set up a complete set of automatic control equipment, should include the following aspects clean room air cleanliness, temperature and humidity, differential pressure control, air conditioning valve; high pure gas, water and cooling water temperature, pressure, flow rate, gas purity detection; water quality monitoring. These monitoring devices can be programmed into a single system of control systems, can also be planned as a distributed computer control and management system.
    以上的介绍,您了解了吗?如果您有不明白的地方,欢迎您的致电,我们全面为您介绍,欢迎您的莅临参观哦。
    Have you got the above information? If you don't understand it, you are welcome to call us. We would like to introduce you to all of you.