    一、一般洁净车间
    1、 General clean workshop
    施工阶段:
    Construction stage:
    指常规的设备安装阶段,包括一些机械设备、送排风系统及吊顶支架等的安装,对施工现场的清洁程度无特殊要求。在一般洁净阶段,进入施工区前,必须将鞋子擦干净。每天有专人负责打扫场地。每天清点一遍材料。在无尘车间施工区内禁止吸烟、食物或喝水,并在明显的位置警示所有进出人员。必须每天清除用剩的材料。工地上应有足够的垃圾箱。人员和材料的进出口须有管理人员控制。每周进行一次施工队伍的清洁工作。禁止任何有污染的工作
    It refers to the conventional equipment installation stage, including the installation of some mechanical equipment, air supply and exhaust system and ceiling support, and has no special requirements for the cleanliness of the construction site. In the general cleaning stage, shoes must be cleaned before entering the construction area. A special person is responsible for cleaning the site every day. Check the materials every day. No smoking, food or drinking water is allowed in the construction area of the dust-free workshop, and all personnel in and out are warned at an obvious position. Surplus material must be removed daily. There should be enough dustbins on the construction site. The import and export of personnel and materials must be controlled by management. Clean the construction team once a week. No polluting work is allowed
    二、非常净化车间施工阶段:
    2、 Construction stage of the very clean workshop:
    指当建筑外围完工之后,加压风机开始工作,所有无尘车间的施工必须在正压环境下操作的过程。此阶段包括无尘车间吊顶、地板、隔墙及洁净管道等的安装施工。在非常洁净阶段,必须遵循如下几点:进入洁净施工区前,必须穿着无尘车间施工专用的鞋,或套上干净的鞋套。经常用真空扫尘器进行打扫。每天清点一遍材料。在无尘车间施工区内禁止吸烟、食物或喝水,并在明显的位置警示所有进出人员。必须每天清除用剩的材料。工地上应有足够的垃圾箱。人员和材料的进出口须有管理人员控制每周进行一次施工队伍的清洁工作。禁止任何有污染的工作。施工材料必须清洁后方可进入施工区。内部施工用材料将单独包装进入现场。非洁净材料需在场外指定地方拆箱,外包装需及时仍进垃圾箱。所有工具必须清洁。
    It refers to the process that when the building periphery is completed, the pressurized fan starts to work, and the construction of all dust-free workshops must be operated in a positive pressure environment. This stage includes the installation and construction of ceiling, floor, partition wall and clean pipeline of dust-free workshop. In the very clean stage, we must follow the following points: before entering the clean construction area, we must wear special shoes for dust-free workshop construction, or put on clean shoe covers. Often use vacuum cleaner to clean. Check the materials every day. No smoking, food or drinking water is allowed in the construction area of the dust-free workshop, and all personnel in and out are warned at an obvious position. Surplus material must be removed daily. There should be enough dustbins on the construction site. The import and export of personnel and materials shall be controlled by management personnel, and the cleaning work of construction team shall be carried out once a week. Any work with pollution is prohibited. Construction materials must be clean before entering the construction area. Materials for internal construction will be separately packed into the site. Non clean materials should be unpacked at designated places outside the site, and the outer packaging should be put into the dustbin in time. All tools must be clean.
    无菌室装修
    三、超级洁净厂房施工阶段:
    3、 Super clean workshop construction stage:
    指无尘车间结构完成后的施工阶段。在此阶段,主要进行过滤器、风淋室等对洁净等级有极高要求的设备安装,工艺管线,以及一些测试工作。在超级洁净施工阶段,进入洁净施工区前,必须穿着无尘车间施工专用的鞋,或套上干净的鞋套。经常用真空扫尘器或便携式带过滤器的吸尘器进行打扫。每天清点一遍材料。
    It refers to the final construction stage after the dust-free workshop structure is completed. In this stage, we mainly carry out the installation of high-efficiency filter, air shower room and other equipment with high requirements for cleanliness level, process pipeline, and some testing work. In the super clean construction stage, before entering the clean construction area, you must wear special shoes for dust-free workshop construction or put on clean shoe covers. Often use vacuum cleaner or portable vacuum cleaner with high efficiency filter for cleaning. Check the materials every day.
    在无尘车间施工区内禁止吸烟、食物或喝水,并在明显的位置警示所有进出人员。必须每天清除用剩的材料。工地上应有足够的垃圾箱。人员和材料的进出口须有管理人员控制。每周进行一次施工队伍的清洁工作。禁止任何有污染的工作。施工材料必须清洁后方可进入施工区。内部施工用材料将单独包装进入现场。
    No smoking, food or drinking water is allowed in the construction area of the dust-free workshop, and all personnel in and out are warned at an obvious position. Surplus material must be removed daily. There should be enough dustbins on the construction site. The import and export of personnel and materials must be controlled by management. Clean the construction team once a week. Any work with pollution is prohibited. Construction materials must be clean before entering the construction area. Materials for internal construction will be separately packed into the site.
    进入超洁净区域,材料必须经如下处理方可进场使用。在场外指定地方拆箱,入口处必须保持正压,并且是密封的,原理同气闸一样。外包装需及时仍进垃圾箱。材料须在指定入口处擦净后使用。过滤器及吊顶材料须用塑料袋保存,直到安装前再拆开作更终检测和清洁。所有材料和工具须用水清洁。新风机连续运转一定保证室内正压。除在无尘车间内所有施工人员需穿着干净的工作服。在无尘车间内穿着洁净服。现场不可使用木制和褶皱的纸板。
    When entering the ultra clean area, the materials must be treated as follows before entering the site. When unpacking at the designated place outside the site, the inlet must be kept positive pressure and sealed. The principle is the same as that of air lock. The outer packing should be put into the dustbin in time. The material must be cleaned at the designated entrance before use. The filter and ceiling materials shall be stored in plastic bags until they are disassembled for final inspection and cleaning before installation. All materials and tools must be cleaned with water. The continuous operation of fresh air fan must ensure positive indoor pressure. Except in the dust-free workshop, all construction personnel shall wear clean work clothes. Wear clean clothes in a clean workshop. Wooden and wrinkled cardboard shall not be used on site.
    本文由无菌室装修提供技术支持,更多的详细精彩内容请点击我们的网站,我们将会全心全意为您提供满意的服务。